Shrewsbury Flaxmill Maltings/
Feilden Clegg Bradley Studios
Project Details
Location(City/Country):
Shrewsbury / United KingdomTipology:
IndustryYear (Design/Construction):
- / 2022Area (Net/Gross):
4181 m2 / 5596 m2Operational Carbon emissions (B6) kgCO2e/m2/y:
-Embodied Carbon emissions (A1-A3) kgCO2e/m2:
-- Derelict building built in 1797 brought back to life
- The project is an exemplar of striving towards a circular economy
- Natural light and natural ventilation have been re-introduced through the re-opening of 110 former windows
- Fabric enhancement with addition of wood fibre insulation to further reduce heating demands.
History
Shrewsbury Flaxmill Maltings has been referred to as the ‘grandparent of skyscrapers’. When built in 1797, it was the world’s first iron-framed building, a new technology developed to give better fire protection, that paved the way for modern-day buildings such as London’s Shard, New York’s Empire State Building and Dubai’s Burj Khalifa.
For nearly a century, the site operated as a state-of-the-art steam-powered flax mill. It was later converted into maltings and during the Second World War the site was used as temporary military barracks. Following the closure of the maltings in 1987, the future of the site and its important buildings became increasingly uncertain until it was bought by Historic England in 2005.
Derelict for many years, the big challenges were overcome the immense technical challenges and to identify a future use to unlock a third age for the Grade 1 listed heritage.
Regeneration
As a flagship heritage regeneration project for Historic England, Shrewsbury Flaxmill Maltings has been brought back to life as an adaptable workspace, leisure destination and social enterprise hub demonstrating how historic buildings can be sustainably reused after many decades in decline, through understanding, innovation, and a gentle touch to repair of the fabric.
The £28 million project has provided a new space for learning on the ground floor which tells the story of the Mill’s role in the industrial revolution and in world architecture, along with a public café. Above, four floors of flexible office space will provide accommodation for around 360 people, circulation and meeting space within the Kiln for commercial tenants, as well as access for visitor tours to the restored Jubilee Tower.
Community Engagement
We have engaged with the local community and wider interest groups to help energise interest in the project. Through developing a narrative around the site, hosting events, art exhibitions, and heritage open days there has been a positive increase in community involvement and a palpable sense of increased pride in the area. The community chose the name ‘Shrewsbury Flaxmill Maltings’ which was then painted in 2m high 50 long lettering over the principal elevation.
A heritage skills programme was delivered during the construction works, using the site itself as a tool for learning. Between 2017 and 2020 a programme of heritage skills activities supported by the Andrew Lloyd Webber Foundation was delivered with work placements, site tours and training events were targeted at all levels from students to industry professionals. Historic England are committed to measuring the Social Value outputs of both the project and in operation for use as a future case study.
Innovation
The project team repaired, reused and retrofitted driven by the values of innovation, revolution and adaptation. The fixed budget and high-quality standard called for the team to work together in new resourceful ways and be scornful of any form of waste. We believe the project is an exemplar of striving towards a circular economy.
The cast iron frame had suffered cracking due to settlement and was under engineered by today’s standards. Replacing and repairing were not consentable or viable options so our structural engineers devised an innovative method of strengthened the masonry around the existing iron to enable it to act as an alternative load path in the event of failure. This brilliant solution meant the entire existing iron frame could be put back to work with the addition of a hidden steel grillage and 6no. new columns at ground floor. The innovations have been published in the Institute of Civil Engineering Journal.
Sustainability
The environmental strategy followed a ‘whole building approach’ championed by Historic England. Putting the building ‘back-to-work’ required comprehensive repair of the existing fabric and the insertion of new core facilities. Bold interventions and a light touch conservation approach has been employed to seek to preserve and enhance the special character.
The existing massing and multitude of internal changes in level suggested the pyramidal Malt Kiln as the obvious entrance in terms of wayfinding and vertical circulation in terms of resolving level access for all upper floors. The decision was taken not to heat this space to dramatically reduce energy in use.
Natural light and natural ventilation have been re-introduced to the Main Mill building through the re-opening of 110 former windows and the introduction of new metal windows with high performance solar glazing. The sense of openness is further enhanced through generous circulation and new glazed partitions with acoustic attenuated ventilators over.
A state-of-the-art structural strengthening design provides the existing fragile cast iron frame additional load capacity and alternative load paths whilst retaining its unique character as a pioneering historic structure.
The thermal upgrading of the existing solid masonry walls was researched through onsite trials and hygrothermal modelling. The research informed the specification of woodfibre insulation to further reduce heating. The dramatic entrance space in the malt kiln is to be unheated whilst the accommodation in the Flaxmill utilises exposed masonry structure for cooling. The strategy revolves around doing more with less, a continuation of the original innovative design.
Traditional craft, materials and skills were used and any new layers of intervention have been chosen to complement the industrial character of the site.
FCBS Carbon was used investigate viable strategies for reducing operational an embodied carbon. The carbon calculation tool predicts an embodied carbon cost of 53 kgCO2e/m2 which less than a tenth of the carbon cost of a new building of similar use. This results from 80% of the existing fabric being retained.
Embodied carbon:
- New build elements emitted 113 kgCO2e/m2, or 472.5 tCO2e
- Retained elements kept 886.4 tCO2e “in use”
- Ratio of retained to new was 65% to 35%
- LETI “A+” rating for embodied carbon
Operational energy:
- Predicted annual energy use: 136 kWh/m2.year
- New glazing saves 65,300 kWh/year ,insulated roofs 92,700 kWh/year and walls 17,600 kWh/year
- Total saving of 175,500 kWh/year or the equivalent of 17.5 houses annual energy use
- Estimated 30 years carbon savings based on thermal upgrades and GSHP: 925 tCO2e
- Client: Historic England
PROJECT TEAM
- Architect: Feilden Clegg Bradley Studios
- Client: Historic England
- Project Manager: Historic England
- Structural & Civil Engineer: AKTII
- Building Contractor: Croft Building and Conservation
- Mechanical & Electrical Engineer: E3 Consulting Engineers
- Landscape Architect: LT Studio
- Quantity Surveyor: Gleeds
- Archaeology: University of Salford
- Ecology: Middlemarch
- Catering: Cooper 8
- Acoustics: ION Acoustics
Photography: Daniel Hopkinson / Historic England